SUMMARY

  • Outcropping high-grade lithium hosted in spodumene-bearing pegmatites
  • Located on a mapped spodumene pegmatite across a strike length of 1.3km with an average width of 500m
  • Samples assay up to 3.38% Li2O
  • Spodumene crystals range between 2cm to 40cm in size
  • Drill-ready targets exist along strike.

Drilling

  • MetalsTech has received drilling permits and other approvals needed to commence exploration drilling at Adina
  • The Company has planned a 2,000m program of diamond drilling, expected to commence mid-2017. Infrastructure is already in place to support this program.